Documentation centre
Download data sheets, tech briefs, installation guides, and more.
Obtaining your Enphase Storage Installation Certification through Enphase University is a mandatory prerequisite to install and commission the IQ Battery 5P in India. Be sure to read the guidelines for your first installation. In addition, you need to have a design review performed by Enphase prior to your first installation.
Installers can purchase an IQ Battery 5P from a local Enphase distribution partner. Visit the how to buy page to find a local distributor.
Only single-phase 230 V L-N loads can be supported for backup with the Enphase Energy System.
Only backup loads from the L1 (A) phase can be supported. Loads from the L2 and L3 phases cannot currently be supported. Refer to the IQ System Controller 3 INT quick install guide for more details on where to connect the load circuits.
This detailed document provides step-by-step instructions for commissioning Enphase Energy Systems with storage using the Enphase Installer App.
No. The handles are designed to fit onto the left and the right side of the battery, and need to be fitted that way due to the plunger that provides additional security during lifting.
No, the IQ Battery 5P Lifting Handles are reusable. You only need one set, and it can be used on multiple installations and for multiple batteries.
No, you only need a pedestal mount on sites where you want to floor-mount an IQ Battery 5P.