be_ixf;ym_202009 d_23; ct_50

Tentative Interim Amendment (TIA) to NFPA 70 NEC 2014 - AFCI

This TIA removes the AFCI requirement for PV wire harnesses and exposed cable systems, such as the Enphase Cable system.

This amendment to NFPA 70, National Electrical Code, 2014 Edition, removes the Arc Fault Circuit Interruption (AFCI) requirement for PV wire harnesses and exposed cable systems, such as the Enphase Cable system. This requirement will also be removed from the National Electrical Code, 2017 Edition.

Related Categories: Microinverter