Florida commercial installation made easy with the right partners

project summary
Client
dtw Research
Installer
A1A Solar Contracting
Utility
Florida Public Utilities
Location
Fernandina Beach, FL
Industry
Market Research
Installation Type
Rooftop
solar system size
43.2 kW
annual solar energy production
56,346 kWh
Enphase microinverters
IQ8-3P
estimated lifetime production
1,595,888 kWh
estimated annual building energy load offset
41% offset from solar
estimated annual savings
$8,916
estimated lifetime savings
$286,022

“We're honored to deliver this system to dtw Research using Enphase IQ8 Commercial Microinverters. Great roof, great client, great product, great economics.”

Pete Wilking
President and Founder, A1A Solar Contracting

Why solar?

With four decades in business, dtw Research has diligently serviced their customers, building a trusted reputation. This solar investment highlights how important sustainability and energy efficiency are to elevating the company's business practices.

When asked about the installation experience, Matt Wetzel, President of dtw Research, explained that “A1A Solar was instrumental in getting us to our goal of having solar power generation. As the client, this was an easy project for me since A1A Solar handled everything from planning and permitting to installation. My to-do list wasn't increased due to this project, and the solar panels were installed quickly and easily.”

Wetzel was able to reach the company's goal of going solar with ease by selecting a quality local installer.

Why Enphase?

Beyond the initial design, installation, and investment of a commercial solar project, business owners should consider replacement equipment costs along with the time and labor needed to handle those events. Enphase makes this conversation easy with its three-phase IQ8 Commercial Microinverters, which have a 25-year warranty that matches the warranty of the solar panels used on this project. By choosing Enphase commercial microinverters, there was no reason for concern regarding downtime production or future added costs.